Power PS62PPB 6ft Pent Bike Shed 사용 설명서
Power PS62PPB 6ft Pent Bike Shed

제품 지침

(Please note – this image is for illustration purposes only. The shed you ordered may be a different size or roof sloping other way)
제품 지침

비디오보기

We recommend watching our installation video before starting assembly of your Power shed.
This video can be applied to all pent sheds in our range

아이콘
QR 코드
https://www.powersheds.com/faqs/how-do-you-assemble-a-power-shed/

시작하기 전에

대부분의 사고는 과실과 부주의의 결과이며 일반적으로 작업자가 간단하지만 필요한 안전 예방 조치를 따르지 않아 발생합니다.

Do not install the garden building before carefully reading this manual.

방문 www.Powersheds.com to check the base size for your shed and any other dimensions you may need.

보건 및 안전

Every effort has been made during the manufacturing process to eliminate splinters on the timber.
You are strongly advised to wear gloves when working with or handling timber.
또한 눈을 보호하기 위해 펠트를 설치할 때 보안경을 착용하는 것이 좋습니다.
안전 아이콘

2인 추천
아이콘

Power Sheds Ltd는 당사 제품의 잘못된 하역, 포장 풀기 또는 조립으로 인해 발생한 손상이나 부상에 대해 책임을 지지 않습니다.

필요한 도구
(제공되지 않음)

  • 드릴
    필요한 도구
  • 정신 수준
    필요한 도구
  • 해머
    필요한 도구
  • 스탠리 나이프
    필요한 도구
  • 발판 사닥다리
    필요한 도구
  • 쏘우
    필요한 도구
Our treatment

갓 처리 된 목재를 다룰 때는 장갑을 착용하십시오.
Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
포함 : IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

May produce an allergic reaction (EUH208). Causes serious eye irritation (H319) Wash skin thoroughly after handling (P264) Wear protective gloves/protective clothing/eye protection/face protection (P280).

눈에 들어간 경우 : 몇 분 동안 물로 조심해서 씻으십시오.
Remove contact lenses, if present and easy to do and continue rinsing. (P305 + P351 + P338)
If eye irritation persists: Get medical advice/attention (P337+P313).

재목

목재는 천연 제품이므로 특히 극한의 기상 조건에서 약간의 움직임, 뒤틀림 및 갈라짐을 포함하여 모양이 변경되기 쉽습니다. 목재에 때때로 갈라짐, 매듭 또는 유사한 시각적 결함이 있을 수 있습니다.

가시적인 옹이 구멍이나 갈라진 틈 없이 목재를 손으로 따기 위해 모든 노력을 기울이지만, 시간이 지남에 따라/제품 이동 중에 다음과 같은 일이 발생할 수 있는 단단한 매듭으로 보이는 것을 포함하는 목재를 선의로 선택하는 경우가 있을 수 있습니다. 이 작은 매듭 구멍은 목재에서 제거되어 작은 매듭이나 균열을 남깁니다.

불행히도, 우리는 제품의 이러한 숙성에 대해 책임을 질 수 없으며, 영향을 받은 지역에 약간의 목재 충전재를 바르거나 극단적인 상황에서 이러한 상황이 발생해야 하는 경우에 이러한 상황을 처리하는 방법에 대한 최선의 조언만 제공할 수 있습니다. 판을 바꿔야 하는 상황.

이 중 어느 것도 제품의 구조적 무결성에 영향을 미치지 않아야 합니다.

회사 및 레벨 기반

All our garden sheds require a firm and level base.
When thinking about where the garden building and base is going to be constructed:

  • 유지 보수 작업 및 연간 치료를 위해 모든면에 접근 할 수 있는지 확인하십시오.
  • Remember not to place the base too close to any walls or fences, as there may be a slight overhang on the roof which may come into contact with the wall or fence.
  • 왜곡을 방지하기 위해 바닥이 평평하고 단단한 바닥에 세워졌는지 확인하십시오.
  • 인용하다 PowerSheds.com for base dimensions.
  • Consider when placing the base next to trees or large bushes as this could cause problems from overhanging branches, especially if these are likely to grow and come into contact with the building in the future and could cause the felt to rip.

베이스는 건물의 외부 치수보다 약간 작습니다. 즉, 클래딩이 베이스를 돌출하여 물이 흘러내리도록 해야 합니다.
침수를 방지하기 위해 바닥은 주변 지면보다 25mm 이상 높게 설치하는 것이 좋습니다.

Power Base를 구매하기로 선택하지 않은 경우 다른 적합한 베이스에는 콘크리트 베이스(75mm의 하드 코어 위에 75mm의 콘크리트) 또는 포장용 슬래브 베이스(50mm의 날카로운 모래 위에 놓인 슬래브)가 포함됩니다.

파워 베이스 키트

If you have ordered a Power Base Kit the instructions can be found in the small base kit fixing pack.
Please scan the QR code to watch our base kit installation video.

빌드 기본 비디오 보기:
아이콘
QR 코드
http://www.powersheds.com/faqs/how-do-you-assemble-the-power-sheds-base-kit/

Component checklist

Components Checklist
Components Checklist

유의하시기 바랍니다

  • Cover lats, which are for each corner of the building and to cover any join in each panel (vertically from the outside) are the pieces of timber

which are 12mm x 58mm thick.

  • Bargeboards, which are for the edges of the roof (although please carefully read the instructions where to put them as some go under the felt and some over the felt) are the pieces of timber which are 12mm x 70mm thick.

고정 팩

Your fixing pack will include:

  • 25mm screws (silver)
  • 35mm 나사
  • 50mm 나사
  • 70mm 나사
  • Clout nails (for the felt)
  • 40mm galvanised nails

If you have ordered a Power Base, you will also receive 80mm and 100mm screws.
Please note 35mm screws are not needed for a pent
(This is a standard pack used for both pent and apex sheds)
On the rare occasion that not enough screws are provided please contact us and make us aware so we can send more out to yourself. Please be aware we are unable to reimburse if you purchase your own.

사전 조립

  1. Safely unpack your components and check that you have all the parts required.
    Please use the table in the two previous few pages to view 주문한 크기에 필요한 구성 요소.
  2. Carefully remove the pallet and any untreated packing timber.
    See the aftercare section on ways to recycle these items or alternatively you can discard them.
  3. Remove any transport blocks from the bottom of the blank and window panels. These are there to offer further protection to the bottom board of the panel.
    조립 설명서

USEFUL TIP!
Re-treat the underside of the floor before assembly for additional protection and maximum longevity.

교련

In the instructions we will talk about screwing panels together. We recommend this is done with a drill.
We suggest that you pre-drill the timber with a 3mm drill bit before inserting the screws.
This will minimise the chance the timber will split.

바닥
  1. Lay down your floor panel(s) onto your firm and level base into the desired position of your shed.
    Be sure to consider any overhangs on the shed when deciding the correct position as per the instructions regarding bases in the ‘before you start’ section.
    NOTE: Do not confuse floor panels with roof panels. Floor panels will have more pieces of framing attached.
  2. For the 6×5 and 6×6 sizes, the floor will be in two sections.
    Turn the floor sections upside down so that the floor bearers are facing up. Join the floor panels together using the 50mm screws provided. You can then turn the floor back the right way to create the full floor.
    For 6×2, 6×3 and 6×4 sheds, the floor panel is in one piece.
  3. Screw the two ‘heavy duty bearers’ which are two pieces of framing joined together, to the two ends of the shed with 70mm screws. This will cover the ends of the floor joists. On our 6×2, 6×3 and 6×4 sizes the bearers will need to run the 6ft length, on our 6×5 and 6×6 sizes the bearers will fix to the gable end as pictured below.

알림
Ensure bearers are added to the floor!

Floor instruction

USEFUL TIP! – If you have purchased a POWER Base you can screw the floor to the timber POWER base below for maximum strength and security. 

  1. Please ensure you have removed the transport blocks as per page 6.
  2. Your shed will come with a number of wall sections. The quantity of these will depend which size you
    ordered. Please see the components table to confirm which panels you should have for your Power Pent Bike Shed.
  3. Start with the 2ft panel that will be part of your 6ft wall – position this on top of the floor panel. Ensure the side of the panel is flush with outer edge of floor (but not overlapping the heavy duty bearer on the 6×5 and 6×6). Then position one of the gable end panels at the end (sitting on the bearer for the 6×5 and 6×6 sizes) and secure these panels together from the inside using the 50mm screws provided. Use three screws per join.
    Walls Mounting

주의 사항 – For 6×5 and 6×6 models the ends of the shed will come in more than one section.
It does not matter which of these goes to the front and back.

중요!
When securing panels together ensure they line up at the top (so the building is square) and that only the ends of the cladding are shown, which will later be covered with corner strips).
This is only in the corner when the side meets the gable.
벽 장착

Place the remaining 4ft back wall panel and then the other 2ft / 3ft / 4ft end wall panels and again secure using the 50mm screws provided.
벽 장착

Keep going until the back wall and both ends are secured together leaving the front section open.

Attach the one panel which goes at the side of doors (called the door wings). Again, continue to use 50mm screws (three screws per join).
벽 장착

Before attaching the other door wing, attach the door sill which looks like a piece of framing in half.
This will be screwed to the floor beneath with 35mm screws.

We would strongly recommend to pre-drill the holes to avoid splitting.
This sill should be 147mm from each end of the floor (but not the floor bearer) and attached to the very outside edge of the floor. (see image below).
벽 장착

You can then secure the other door wing using 50mm screws.
벽 장착

Once the two panels are on which go at the side both sides of the doors (door wings), you can add the door head. This is the part which has the ‘Power’ brand on. To secure these to the panels below you need to screw up through the door wings and into the door head. We strongly advise you to pre-drill before screwing to avoid the timber splitting. You can then secure the door head to the side wall panels.
벽 장착

모든 측벽이 정사각형이고 상단에 정렬되어 있는지 확인하십시오.
벽 장착

When you have secured all the wall panels together you then need to secure these to the floor using 70mm screws provided. Screw into the floor with 2x screws for every wall panel (internally) ensuring the screws are driven through the framing at the bottom of the side/gable walls, through the floorboards and into the floor joists.

USEFUL TIP!
바닥에 있는 기존 못의 위치에서 바닥 장선의 위치를 ​​파악할 수 있습니다. 직립 프레임 또는 모서리 버팀대가 방해가 되는 경우 바닥 장선에 비스듬히 못을 박아야 합니다.

If you are securing these panels against a wall (which gives you little access to nail the cover strips on,\ explained later) you can pre-assemble a side and move the whole side into position (with the cover lats already nailed on).

프론트 탑 & 게이블스

The Power Pent Shed can be higher at the front or the back – you can choose this as you assemble it.

  1. Add the pent front top to the side you want to be higher and screw to the panels below with 50mm screws. Screwing upwards through the framing from the inside.
  2. Do the same with the gables at each end.
    프론트 탑 & 게이블스
    프론트 탑 & 게이블스
지붕
  1. Your pent will come with one roof panel (if it’s a 6×2 or 6×3) or two roof panels (if it’s 6×4, 6×5 & 6×6).
  2. Place the roof panel(s) in place so that the framing on the roof panel run parallel with the gables i.e. from the high side to the low side. These are not handed so can go on either side and does not matter which direction the tongue and groove of the boards run as it will be covered by the felt and barge boards.
    지붕 장착
  3. Make sure the framing on the roof is in line with the framing on the gable top so that the overhang on the front and back is correct.
  4. If applicable, join the roof panels to each other and to the gables using 50mm screws, going through framing from the inside of the building.
  5. Then, screw the roof panels to the front and back wall panels with 50mm screws (ensuring you screw up through the framing of the front and back panel into the framing of the roof).
  1. our shed will come with two doors which you will need to hang.
    The door with the lock on will go on the right (as you look at the shed from the outside) and the door with the shoot bolts will go on the left.
  2. Position one of the doors in place ensuring the gap between the edge of the door and the shiplap tongue and groove cladding (which you will be screwing the doors in to) is approx. 5mm. This is the same for the top of the door where the gap should also be approx. 5mm.
  3. Ensure that it is square and when you are happy with the position, secure the hinges in place using the 25mm screws provided.
  4. Repeat this process with the other door.
    Doors Mounting
  5. Choose a place above the door to secure your turn button.
    Be careful not to screw this too tightly or it will not turn.
펠트

Health and Safety – Use safety goggles when installing the roofing felt.
안전 아이콘

  1. Before laying the felt, you will need to attach the back bargeboards with the 40mm galvanised nails. As you can see there are two for the back – one at the edge of the roof and one on the underside.
    These soffits may come in more than one section and may need cutting down to size with a saw depending on which size shed you have chosen.
    Be sure not to mix these up with the corner strips and cover lats which are to go vertically around the shed in corners and covering joins (explained later).Felt Mounting
  2. Roll out the mineral roofing felt along the lower part of one side of the roof. Allow for sufficient overhang to fold down onto the roof bargeboard (but not the underside roof bargeboard).
    Health and Safety – Use Step Ladders to put on the roof felt but do not climb on top of the roof.
    Ensure there is a second person to support you when using a ladder.
    주의 사항 – If you are unsure on how to felt the roof please contact us directly for more information. Please be aware, we cannot reimburse you if you choose to purchase additional materials.
  3. Use clout nails to tack along the top edge of the felt and into the roof board and the bottom edge of the felt into the back barge board.
  4. Repeat this process along the higher part of the roof.
    Overhanging felt
    Fold down the overhanging felt on the gable ends and tack this into place.

중요!
Take care not to tack into the tongue and grove join between each board as this can cause leaks.

마감 처리

  1. Using the 40mm galvanised nails, fit the bargeboards, which are 70mm wide, to the high side and ends of the roof. Again, these may need cutting down with a saw depending on what size building you have.
    중요!
    There is no bargeboard for the low side as it could trap rainwater from running off the roof
    바지선
  2. Secure corner strips which are 58mm wide, at each corner of your Power shed with 40mm nails (at least four per strip). Extra strips are provided to cover the joins between side wall panels.
  3. Secure the door pull to the door with 25mm screws.
  4. Ensure there are no overhanging branches or debris on the shed as this can lead to water ingress.
    Please be aware, this will need to be checked regularly as part of the maintenance of the shed.
  5. Peel the protective blue sticker off the Power branding plate above the door.

애프터 케어 및 유지 보수

창문을 봉인하십시오

We recommend windows are sealed externally with the application of silicone, putty or any other ‘watertight’ solution at your own preference.

중대한
Please ensure you thoroughly seal the exterior bottom corners of the windows at the edge of the sill.

창고 보존자

All our sheds come with our Power preservative.
It is important that you re-treat your Power shed annually with a high-quality wood preserver.
Feel free to change the colour of the building giving you the ‘power’ to style it your own way.
Take extra care to brush treatment into all wooden components inside and outside.
Please ensure there are no overhanging branches or debris on the shed as this can lead to water ingress.

SEFUL TIP – Looking for some inspiration?
Our Instagram has images of hundreds of Power Sheds which have all been sent to us by customers and is a great way to look at the different ways you can build and paint your shed!

베이스 확인

조립할 때 베이스가 수평을 유지해야 하지만 일부 베이스는 시간이 지남에 따라 움직일 수 있으며 이러한 현상이 발견되면 건물이 비틀리거나 문이 제대로 닫히지 않을 수 있습니다.
이러한 상황이 발생하면 건물 수준을 유지하기 위해 기지를 포장해야 할 수도 있습니다.

창고 공유

Here at Power we love to see your sheds!
Send us photos of your finished sheds to our social media channels using the following handle

@PowerSheds
#PowerSheds

인스타그램 인스타그램

Twitter Twitter

Facebook Facebook

파워 셰드 선반 지침

Power Shed Shelving comes 4ft or 6ft long.
You will receive the following components in each shelving pack:

  • (4x) board lengths (at either 4ft or 6ft depending what you ordered).
    Please note: These are 70mm wide and are the same material as the bargeboards.
    Be careful not to use these during assembly of your Power Shed – These boards are usually taped together.
  • (3x) Brackets
  • (2x) Batons
  • (1x) Fixing pack – containing 70mm screws and 25mm screws.

참고 :

  • When screwing the brackets into position, ensure they are fixed to the internal framing of the shed and not the cladding
  • You may have to cut the board lengths down with a saw to fit depending on the shed you have
  1. Choose an appropriate location for your shelving and screw the brackets to the internal framing of the shed with the 70mm screws.
  2. Use a spirit level to ensure they are level.
    Ensure the shelving bracket is the correct way up as per the diagram following:
    Appropriate location

창고에 따라 브래킷을 고정할 적절한 위치가 없거나 부적절한 위치에 프레임이 있을 수 있습니다(특히 선반이 박공 끝으로 가는 경우). 따라서 필요한 경우 사용할 추가 지휘봉을 보냈습니다.

After the brackets are attached to the framing of the side walls, you can fix the shelving board lengths into the brackets which the 25mm screws. There should be two screws per board per bracket. There should be a small gap between each board length

반품

Power가 귀하를 위한 것이 아니고 배송 후 14일 이내에 창고를 반품하려는 경우 수집 수수료를 부과하지 않고 귀하로부터 품목을 수집합니다. 소란, 수수료 없음!
우리가 요구하는 것은 창고의 포장을 풀거나 팔레트에서 창고를 꺼내지 않는 것입니다. 창고 패널의 품질을 다시 확인하려면 팔레트에서 창고 패널을 볼 수 있습니다.
취소 또는 반품을 준비하려면 가든 빌딩을 주문한 회사에 알려야 합니다.

If you have unpacked the shed or taken the shed off the pallet, then you can still return the product to us providing it is within 14 days of delivery but you will have to cover the cost of returning the item. This will either need to be arranging the delivery yourself (to our manufacturing unit in West Yorkshire) or repacking and securing the goods back onto the pallet and we can arrange a pallet delivery for you. The cost of this will depend on your location and the item bought – please contact us if you would like us to advise the cost of this. In this case we will not profit from any courier charges but simply pass on the cost we receive to you.

귀하가 지불한 배송 추가 요금(예: 더 빠른 배송, 토요일 배송 또는 시간 지정 배송)은 환불되지 않습니다.

상품이 반품되면 상품이 완전하고 재판매 가능한 상태인지 확인합니다. 제품이 재판매 가능한 상태가 아니라고 판단되는 경우 사용 또는 반품하는 데 드는 비용을 충당하기 위해 합리적인 금액을 공제합니다.

환불이 이루어져야 하는 경우 일반적으로 귀하가 구매 비용을 지불할 때 사용한 것과 동일한 방법을 사용하여 귀하로부터 받은 금액을 환불해 드립니다.

문의하기

창고에 대한 질문이나 문제가 있는 경우 다음을 수행할 수 있습니다. 

  • Check out our FAQ page on www.PowerSheds.com
  • (으)로 이메일을 보내 [이메일 보호]
    Please provide photographs of any reported issues*
    Any replacement parts can take 1-3 working days.
  • Contact us via the telephone – 01274 036 577 (Mon-Fri 08:00 – 16:30)
  • Write to us at: Power Sheds Ltd
    21 Commondale Way
    Euroway Trading Estate
    브래드 포드
    BD4 6SF
  • 드물게 누락된 것이 있는 경우 교체품을 발송할 수 있도록 당사에 알려주시기 바랍니다. 교체 부품은 영업일 기준 1-3일 이내에 발송됩니다.
  • Please be aware we are unable to reimburse you if you purchase your own materials.
  • We also cannot compensate for sub sequential losses such as installation work.

 

문서 / 리소스

Power PS62PPB 6ft Pent Bike Shed [pdf] 사용 설명서
PS62PPB, 6ft Pent Bike Shed, PS62PPB 6ft Pent Bike Shed, Pent Bike Shed, Bike Shed, Shed

코멘트를 남겨주세요

귀하의 이메일 주소는 공개되지 않습니다.