According to the manual provided, here are the steps to properly install the AXIOM AX16CL Floor and Front Fill with foam Stand:
1. **Supplied Materials:** Ensure you have all the necessary components and materials required for installation as per the manual.
2. **Typical Applications:** Understand the typical applications for the product, which include front-fill or monitor applications on stage.
3. **Conditions of Use:** Proel emphasizes the importance of following safety standards and regulations during installation. The product must be installed by qualified personnel only.
4. **Warnings:** Pay attention to the warnings provided in the manual, such as ensuring the stability of the ground where the foam stand is placed and securing it to a subwoofer if used on top of it to prevent falls due to vibrations.
5. **Contact Manufacturer:** If you have any doubts or need further information regarding the installation process, it is recommended to contact the manufacturer, Proel S.p.A., for assistance.
By following these guidelines and instructions provided in the manual, users can ensure a safe and proper installation of the for their intended applications.