To enable Dynamic Power Management (DPM) on your eSolutions ឧបសម្ព័ន្ធ ePro Wallbox and configure it with the Power Meter, follow these steps as outlined in the installation guide:
1. **Install the Power Meter:**
- Place the Power Meter provided after the main utility meter and before the split power.
- Follow the instructions in the meter installation manual included in the package for three-phase or single-phase electrical connections.
- Feed the Modbus communication cables through the ePro Wallbox box sheath using the suggested cable: STP class 5E, 0.5 mm2 section.
- Connect the communication cables from the Power Meter to the ePro Wallbox starting from the left on the RS485 output port CN12.
- If included, connect the Current Transformers as indicated in the meter installation manual, ensuring the correct direction of the line through the clamp.
2. **Energy Meter Configuration:**
- Access the menu by tapping & holding the central display button for three-phase meter (or the lower part of the display for single-phase) until the password page is shown.
- Navigate the menu using the left (or upper for single-phase) display button.
- Configure the Gavazzi Meter or Finder Meter parameters as per the instructions provided in the manual.
3. **Parameters Configuration (Installers Only):**
- Use the Power Up app, available for qualified installers via Google Play® and App Store®, to configure the wallbox.
- Download the app on your smartphone and pair it with the wallbox by scanning the QR code on the label.
- Configure the DPM settings, including enabling the functionality, setting the contractual power value, selecting the Power Meter model, and setting the Current Transformer ratio.
4. **DPM User Configuration:**
- Download the eSolutions Charging App to configure the wallbox and monitor operating parameters.
- Associate the wallbox with your profile by scanning the personal QR code on the wallbox.
- Set your Contractual Power value in kW and enable the Home Power functionality.
5. **Load Unbalance:**
- If required by local regulations in countries like Germany, Austria, Switzerland, and Netherlands, enable the load unbalance function and configure the maximum current phase unbalance.
Always ensure that the installation and configuration are performed by qualified personnel in accordance with local regulations to ensure the safe and efficient operation of your eSolutions ឧបសម្ព័ន្ធ ePro Wallbox with Dynamic Power Management.