នេះបើយោងតាមសៀវភៅណែនាំសម្រាប់គ Aidapt President Grab Rails/Grab Bars, here are the guidelines for properly fixing the grab bars onto different substrates:
1. Check the Substrate: Before installation, ensure that the substrate where you intend to fix the grab bars is sound. Check if it is brick, block, timber, or concrete.
2. Avoid Pre-Stressed Concrete: Never drill through pre-stressed concrete to install the President product.
3. Select Suitable Fixings: Choose the appropriate fixing method based on the substrate. For sound brick and block, it is recommended to use a minimum xxxx length of 50mm x size 10 with a suitable rawl plug and screws.
4. Use Stainless Steel Screws: To prevent rusting, it is advised to use stainless steel screws for installation.
5. Plasterboard Installation: When fixing to plasterboard stud or lathe and plaster, locate the studs and span them with a suitable timber plate of at least 40mm x 150mm. Secure the plate to the studs and then fix the grab bar to the timber plate using suitable counter sunk screws.
6. Avoid Direct Installation: Never install grab bars directly onto plasterboard, MDF, chipboard, or other composite materials as it compromises user safety.
7. Utilize All xxxx Holes: Always use all xxxx holes provided in the grab bar for secure installation.
By following these guidelines and ensuring that the grab bars are securely fixed to the appropriate substrates, you can ensure the safety and reliability of your ជំនួយ President Grab Rails/Grab Bars.