**ការដំឡើង and Wiring Instructions:**
1. **Professional Installation:** All installation and debugging operations should be carried out by professionals or individuals familiar with the switch device. Safety precautions must be observed during the installation process.
2. **Pre-Installation Checks:**
- Ensure the switch is not damaged and check for any environmental effects.
- Check for loose wires due to transportation and clean any smudges on the switch.
3. **Wiring Connection:**
- Main loop wiring should ensure that the leading wire does not experience any pressure.
- Verify phase sequences for the first circuit connection.
- Follow the wiring connection diagram provided in the user manual strictly for the second circuit connection.
- Pay attention to the control power voltage class during wiring.
- Ensure proper grounding during switch installation.
4. **Debugging Instructions:**
- The debugging handle should only be used for debugging purposes, not for on-load operations.
- Initially, use the handle to operate the switch and check for any abnormalities before manual operation.
5. **Operation:** If no issues are observed during the above steps, normal operation can commence.