ចម្លើយ

ថ្ងៃទី 24 ខែកុម្ភៈ ឆ្នាំ 2025 - ម៉ោង 03:30 ព្រឹក
To install the pump hose on the RUNZE FLUID RZ1030B ម៉ាស៊ីនបូមទឹក Peristalticអនុវត្តតាមជំហានទាំងនេះ៖
1. Open the spring lock located on the pump head.
2. Open the upper-pressure block.
3. Install the pump hose, ensuring that the fittings on the two ends of the hose are stuck to the pump head.
4. Close the upper-pressure block.
5. ការដំឡើងត្រូវបានបញ្ចប់។
It is also recommended to grease the hose with a certain amount of grease to prolong its service life.
For more detailed information and illustrations, please refer to the instruction manual provided by ដំណើរការសារធាតុរាវ.
បន្ថែមមតិយោបល់ថ្មី។