Installation Instructions
What you get:
Two main U-shaped side frames.
Two vertical support posts.
One curved handrail.
Four short connecting rods/bolts.
Six longer connecting rods/bolts.
Ten medium screws.
Four large bolts.
One rectangular panel.
Three rectangular step panels.
Twenty medium screws.
Thirty-four nuts.
Installation steps:
-
Assemble the base structure by connecting two of part A*2 using screws J*2 and nuts K*2 for each connection point. This forms the main side supports.
-
Attach the vertical support posts (B*2) and connecting rods (D*4, E*6) to the base structure. Secure these parts using screws (F*2) and nuts (K*2) at designated points. The handrail (C) is also attached in this step.
-
Continue reinforcing the structure by attaching more connecting rods (D*4, E*6) and supports (B*2) using screws (F*2) and nuts (K*2). Ensure all connections are firm.
-
Install the first set of step panels (I). Attach one panel (I) to the frame using screws (J*2) and nuts (K*2) at each end.
-
Attach the remaining step panels (I*2) to the structure in a similar manner, using screws (J*2) and nuts (K*2) for each panel.
-
The final step shows the completed 4-step stool with the handrail (C) and all step panels (I) securely attached to the frame (A, B, D, E), fastened with screws (F, J) and nuts (K).
Note: Before using this product, please check and tighten all screws; we hope it is a shopping experience that makes you satisfied, thank you for choosing us!
