16948 Simon 3 Saunahaus
Instruction Manual
16948 Simon 3 Saunahaus
https://www.karibu-farbenshop.de/
Building Instructions
Werkzeuge ools* |
|
X |
![]() |
X |
![]() |
X |
![]() |
X |
![]() |
X |
![]() |
X |
![]() |
|
![]() |
X |
![]() |
X |
![]() |
|
![]() |
|
![]() |
X | ![]() |
Technical specifications | ||
The type of oven purchased or the to fnd the purchased control unit. Please refer to your technical data advises of the following | ||
Device | Netzspannung | Wattage |
fen | ||
9k oven bio | 400V 3N | 9k |
9k oven Finnish | 400V 3N | 9k |
9k oven integrated steering | 400V 3N | 9k |
4.5k oven organic | 400V 3N | 4,5k |
4.5k oven Finnish | 400V 3N | 4,5k |
4.5k oven integrated steering | 400V 3N | 4,5k |
3.6k oven Bio | 230V 1N | 3,6k |
3.6k oven Finnish | 230V 1N | 3,6k |
3.6k oven integr. steering | 230V 1N | 3,6k |
control units | ||
external control Easy Bio | 400V 3N | max. 10,8k |
external control PlugPlay Bio | 240V 3N | max. 10,8k |
external control Finnish | 400V 3N | max. 10,8k |
external control PlugPlay Finnish | 240V 3N | max. 10,8k |
multi control unit | 400V 3N | max. 10,5k |
external control Classic Bio | 400V 3N | max. 9k |
external control Classic Finnish | 400V 3N | max. 9k |
external control Premium Bio | 400V 3N | max. 12k |
external control Premium Finnish | 400V 3N | max. 9k |
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Overview
Not included
Length must be determined and sawn
Glue! ook for the same height
Width side up
his gure shows the functional principle of the board. Regulate the exhaust air according to your own wishes.
Eemplarische Kabelverlegung
Roong felt installation
Note! This description is only an example!
he bitumen roong is used for initial cover and should be supplemented by a separate product according to customers choice after two months. he number of bitumen strips to be used depends on your actual house size. hen joining rolls of roong felt end to end, the overlap must be aproxximately 10cm. he roof is not safe to walk on. he roof is designed for a total load snow, wind and not for a point load. We recommend you to always support the roof from below during installation. he sealing of the roof surfaces to adjacent components with bitumen sealant has to be effected by the customer! If it is a saddle-roofed house, do not use roong tiles for roong. In this case, a 20 cm wide strip of bitumen with overhang should be installed on both sides of the eaves. For houses with a tonne roof, please install a bitumen roong under the shingles. In the case of a at roof the laying of roof shingles is not possible!
Installation of glass doorPut the door glass in the frame
All adjustable eccentrics must have the
83352 83353
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Handling • Maintenance • Care of the door
The guarantee is conditional on proper upkeep!
For lasting protection of the value and suitability for use, professional care and maintenance is also recommended during the warranty period this is not included in the warranty obligations. Defects must be repaired immediately upon detection.
Wood protection treatment of the door
All parts of the door must receive wood protection treatment.
Those sections of the wood, which will not be accessable after installation, should receive complete treatment before installation. reat the product with a blue stain blocking coat afterwards apply a double protective coating of an open-pored wood-protection glaze. pplication of a protective coating should be repeated at least every two years. Please beware that the inserted plates of other material may come to differ in colour to the doors if you use unsuitable coating material. ith coloured and boiler pressure impregnated houses, only the exposed natural wood saw cuts and parts should need extra treatment. You can obtain an even colour covering in inside areas with one coat of paint. For that you should use an open-pored, acrylic based water dispersed lacquer. In order to guarantee a long service life of your product you should repair damaged areas immediately. Do this by whetting the damaged area and apply a new coat of paint. Enquire about suitable glazes at your local paint retailer. Furthermore, you can seal the joining of the wood-window pane with a suitable sealant to guarantee a long service life of the door and prevent leakage from heavy rain. If these precautions of care are not properly carried out, it can result in deformation, blue stain, fungus infestation in the doors and frames and loss of warranty.
Cleaning
Regular cleaning and care is a prerequisite for preserving the service life and functionality of high-value products. Cleaning is to take place outside, inside and also in the rabbet-area. he cleaning agent used must be suitable for the relevant material please do a test before you start cleaning.
Deformation of the door
Wood reacts to environmental in uences.
Weather exposure will lead to swelling and contraction of the wood. his causes variances of dimensions and slight deformation. Dependant on the weather exposure, the door may need realignment by turning the hinges in- or outwards. Some door warpage is acceptable as long as the door can be made to function through the alignment options speci ed here. he warranty does not cover damage caused by use of excessive force.
Adjustment of the door
he door must be accurately adjusted to ensure trouble-free operation. The door frames must be installed right-angled and perpendicular. Furthermore, they must be installed so the width of the frame is the same at the top and bottom. If the door doesn’t close or if one panel is askew, this can be rectied by limited in- or outwards turning of the hinges.
You can turn the hinges outwards up to 5 rotations. If you have a double-door, the door to be secured must always be correctly aligned at the top and bottom with the appropriate hinges.
85269 86952 85019 85020
27.04.2018
Building Instructions
38588 44302
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Documents / Resources
![]() |