Instruction Manual for SnapCab models including: 526 Economy Frame Ceiling, 526, Economy Frame Ceiling, Frame Ceiling, Ceiling

Brian Godshall

Download Economy & Frame Ceilings Instructions

Installation Instructions – SnapCab - Elevator


File Info : application/pdf, 5 Pages, 628.46KB

PDF preview unavailable. Download the PDF instead.

526 Economy Frame Ceiling Install Instructions ?v=1658500114
Call 888-766-7834 Press 0 and ask for installation assistance

Economy & Frame Ceiling Installation Instructions

Installation - Tools Needed
 All Necessary Safety Items  Utility Knife  (2) Tape Measures  Step Ladder(s)  MC Cutter & Wire Strippers  Lineman Pliers  Lock-tight

 Reciprocating Saw w/ Metal Blade  Two (2) Cordless Drills/Drivers  Phillips Head Bit  Dust Pan and Brush  (2) 7/16" (11mm) Sockets & Ratchets
Alternative (2) Wrenches or (1) Socket & Ratchet and (1) Wrench

IMPORTANT: Unpack and check shipment for any damage. Verify color, size and all parts before demolition.
Helpful installation videos are located here: https://elevator.snapcab.com/pages/installation-instructions

Economy Ceiling

Frame Ceiling

2674 Economy & Frame Ceiling Installation Instructions

Page 1 of 5

7/21/2022

1. Prepare existing cab shell.  Protect cab floor.  If installing new wall panels, remove old wall
panels and ceiling. Installation of new ceiling
is recommended before installing new wall
panels.  If necessary, paint top 4" of all non-access
walls and a 6"-8" border on canopy with matte black paint (not included).

Fluorescent or LED UniLED

2. Determine type of new lighting, if included.  If retaining existing lights, proceed to step 4.  If installing new lights, determine if
fluorescent, LED, or "UniLED".  With fluorescent or LED lights, proceed to
step 3.  With UniLED lights, follow installation
instructions supplied with light fixtures and
power supply. Then proceed to step 4.  When installing lights, position light fixtures
on canopy so they will evenly light cab.  We recommend to remove the car top exit
for ease of installation.

3. If needed, assemble light kit and install.  With fluorescent lights, assemble light kit.
Mount light sockets and metal end caps on
fixtures.  If necessary, drill hole through canopy for
light wiring.  Fasten fixtures to canopy w/ supplied
hardware.  Connect wiring between multiple fixtures.  Make sure power is off.  Connect hot, neutral, and ground circuit
wires.  Install fixture covers and install supplied light
bulbs. Turn on power.

Page 2 of 5

7/21/2022

4. Assemble "Frame Perimeter".  Outside the elevator, on a protected floor,
lay frame perimeter pieces face down with label side faced out.  Ensure ends are even and face of rail and cross member are flush. Use "Frame Assembly Hardware" to assemble perimeter pieces together.  Install and tighten bottom screw first through rail and into cross member followed by top screw.  Repeat for all corners
5. Determine where to attach mounting legs to ceiling frame.  Based on equipment on canopy, select
appropriate holes on ceiling frame to mount legs to frame.  Ceiling size will determine how many mounting legs are necessary. Most capacities 5,000 lbs. or less will only require four (4) mounting legs.

6. Attach mounting legs to ceiling frame.  Position L-shaped legs to point in toward
center of frame.  Align hole in mounting leg with hole in
ceiling frame. If mounting location will
interfere with equipment above canopy,
relocate leg (using it as a template) and drill
another 5/16" mounting hole in frame.  Use "Leg to Frame Hardware" to bolt L-
shaped legs to perimeter of ceiling frame by
inserting bolt from inside frame. Lock washer
and 7/16" nut will be on outside of frame perimeter.  Repeat for remaining legs.

Page 3 of 5

7/21/2022

7. CPhreepcakraelitgonamtteancth. ceiling to canopy  LRaeytraiefvreamsuinpgplsieqduawreoodvesrptroinegksitcikcks.
bDienpdeenrsdingconrnceerislinangdsilzoeo,kspforirngasptsic.ks come  Cinhfeuclkl lteonsgethe oifrttoweokiscekcbtiionndsetrhsaatremust be
saqttuaacrheewdittohgceotrhneerr. Sapnrdinagt staimckes shheoiguhldt.be  T1i/p4:"T-e1m/2p"orloanriglyerintshtanllitnhgeladyimere2nsion from
pflaonoerltso(wcaitnhoopuyt. construction adhesive),  fLaifsttecenielidngwiinthtoopnleacsec.reWweedagcehs,pwriinllghsetlipcks
wunitdhecrhmeockuintginagliglengms etontt/ehmeipgohrta(rsielyehold up sfrtaempse1. 1 & 12).  Position ceiling frame with even gap between frame and walls. With a measuring tape, ensure equal ceiling gap on all sides.
8. Measure obstructions on canopy.  One installer take only washers and nuts
from "Leg to Canopy Hardware, tape measure, reciprocating saw with metal blade, lock-tight, and 7/16" (11mm) socket & ratchet or wrench on top of canopy.  Installer inside cab communicate location of mounting leg holes to installer on top of cab. Avoid obstructions (door equipment, car top exit, etc.) on top of canopy before drilling.

9. Drill holes to attach frame to canopy.  Ensure no equipment is located above
mounting leg holes. If a leg is located so it
cannot be attached, mount other legs first,
then reposition mounting leg elsewhere on
frame (drill new 5/16" hole as needed).  Once clear, installer inside cab drill a 5/16"
hole through mounting leg hole, through
canopy.  Repeat for each mounting leg.

Drill new hole as needed. Page 4 of 5

7/21/2022

10. Attach frame to canopy.  Installer inside cab push bolt through first
hole while installer on canopy attaches washer and nut.  Repeat steps until all mounting legs are attached. We suggest using lock tight on the bolt threads and then double-nut bolts.  Cut off excess bolt flush with nut.  Once all mounting legs are attached, installer on canopy can return to inside cab.  Replace car top exit if it was previously removed.
11. Install diffusers, longer "Frame Cross Members", short Frame Cross Members, & clips  Remove protective film from diffusers. Start
at one side of ceiling. Install ceiling diffuser followed by longer cross member.  Clips are used to hold short cross members near car top exit in place. Place clip over intersection, along perimeter, indicated with "Install Clip Here" stickers. Push clip down onto frame to lock into place.  Continue to install cross members and diffusers consecutively, working toward the other side of the ceiling.  Repeat until all cross members and ceiling diffusers are installed. Remove protective coating from ceiling frame.
12. Clean.  If wall panels are included with this project,
move on to wall panel installation instructions.  If a ceiling only, remove any remaining packing material or protective film and dispose of debris.

Page 5 of 5

7/21/2022



References

Microsoft Excel for Microsoft 365