Read the NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User. Manual (2019) or instructions before installing the ...


File Info : application/pdf, 16 Pages, 1.75MB

PDF preview unavailable. Download the PDF instead.

NetCol5000-C065 In-row Chilled Water Smart Cooling Product Quick Guide (Russia, Skoltech)
NetCol5000-C065 In-row Chilled Water Smart Cooling Product Quick Guide (Russia, Skoltech)

Issue: 01 Date: 2021-01-08
1 Overview

Model Power system

NetCol5000-C065
220 V AC to 240 V AC, 1 PH, 50/60 Hz, dual power supplies

Net weight (full configuration) About 222 kg

Dimension (mm) (H x W x D)

2000 x 600 x 1200

(1) Electric control box
(3) Main control board (5) Temperature and humidity sensor (7) Chilled water outlet pipe

(2) PSU (4) Differential pressure switch (6) Wet film humidifier (8) Water pan

(9) Drainpipe
(11) Chilled water valve actuator (13) Heat exchanger

(10) Water pump (12) Chilled water inlet pipe

2 Preparing Materials

Materials

Fuse, combined hexagon head bolts M12x90, OT ground terminal of the power

Configured with cable to the indoor unit, and single cord end terminal of the power cable to the

the Equipment indoor unit, cable tie

Humidifier water inlet pipe

Rigid pipe: G 3/4-inch rigid pipe connector with internal threads (plastic materials such as PA66, or metal materials are recommended), and rigid pipe (withstand pressure  0.7 MPa)

Engineering Procurement

Chilled water inlet and outlet pipes

Seamless steel pipe with a G 1­1/2 inch external threaded connector or aluminum plastic pipe with an inner diameter of 41 mm.

Cables

Power cable (3x6.0 mm²), teamwork networking and monitoring cables, and equipotential cable ( 16 mm²)

Others

Indoor unit base, thermal insulation foam, and thermal insulation foam glue

Copyright © Huawei Technologies Co., Ltd. 2021.

1

All rights reserved.

2.1 Preparing an Indoor Unit Base

1. Shock absorption bars (EPDM rubber, 5 mm thick) need to be installed between the ground and the base.
2. The base should be at least 250 mm in height. The base bearing capacity must be at least 2 t.
3. You are advised to use angle steel, square steel or channel steel. Thickness of 3 mm to 5 mm is recommended.

Unit: mm

2.2 Holes in Top and Bottom Plates

(Top view of the bottom plate) (Top view of the top plate) Unit: mm

Front Rear

(1) Equipotential PE cable hole (28 mm)
(2) Drainpipe hole (43 mm)
(3) Humidifier water inlet pipe hole (43 mm)
(4) Chilled water inlet pipe hole (103 mm)
(5) Chilled water outlet pipe hole (103 mm)
(6) Power cable hole (43 mm)
(7) Signal cable hole (43 mm)

3 Installing the Equipment
1. Read the NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual (2019) or instructions before installing the NetCol5000-C.
2. You are recommended to use tools that are fully insulated when installing devices. 3. Only engineers from the manufacturer or engineers certified by the agent are allowed to
install, commission, and maintain smart cooling products. Otherwise, personal injuries and device damage may be caused, which is beyond the smart cooling product warranty range.
2

3.1 Removing Air Filters

3.2 Discharging Nitrogen
Slowly open the exhaust valve to release nitrogen and close the valve afterwards.

1. The equipment has been injected with 0.2­0.6 MPa of nitrogen before delivery. If no nitrogen is discharged, contact Huawei technical support.
2. You can open or close the exhaust valve using a flathead screwdriver.

3.3 Removing the Pallet

3.4 Leveling the Cabinet

The connectors are secured to the equipment with M6 screws and secured to the pallet with M12 screws.

Level
3

3.5 Installing Cabinets Side by Side 3.6 Securing the Equipment

Rear

Front

4 Installing Pipes
4.1 Pipe Layout

1. A 1:100 tilt should be reserved for the main drainpipe and humidifier water inlet pipe. 2. Keep a clearance of at least 25 mm between pipes. Secure the pipes to supports every a
certain distance. 3. Clean the water inlet engineering pipes to avoid impurities entering into the humidifier. 4. A reducing valve must be installed if the inlet water pressure exceeds 0.7 MPa. 5. Pipes should be wrapped with thermal insulation foam along the route.

Unit: mm

Pipe support

4

4.2 Drainpipe Layout
Secure the drainpipe properly.
4.3 Connecting the Humidifier Water Inlet Pipe
Connection method G 3/4 inch reserved connector with outer screw thread G 3/4 inch adapter with inner screw threadNote1 Matched with the adapter, the pressure resistance should be at least 0.7 MPa
Note 1: 1. When plastic materials such as PA66 are used, the recommended torque is 5 N·m. 2. When metal materials are used, the recommended torque is 10 N·m. A sealing washer must be
used when an union is used.
5

4.4 Connecting the Chilled Water Inlet and Outlet Pipes
Aluminum plastic pipe
(1) G 1­1/2 inch port with inner threads (reserved device port) (2) Direct connection of external teeth (3) Sealing ring (4) Nut (5) Aluminum plastic pipe with an inner diameter of 41 mm Seamless steel pipe
(1) G 1­1/2 inch port with inner threads (reserved device port) (2) Seamless steel pipe with a G 1­ 1/2 inch external threaded connector
6

4.5 (Optional) Leakage Test with Nitrogen
· If the pressure has fallen, apply soapy water on the pipes, especially pipe joints, to check for leakages. Rectify the leakages if any.
· If the pressure is stable, wrap all pipes and connectors with thermal insulation foam. · Install a reducing valve on the outlet of the nitrogen cylinder. Its outlet pressure must not
exceed 0.8 MPa. · In addition to the leakage test with nitrogen, there is the leakage test with water. You can
choose one test based on site requirements.
1. Rotate the chilled water valve to the maximum (100%).
2. Check that the needle and exhaust valves on the pipeline are closed.
3. Connect a reducing valve and a nitrogen cylinder at the needle valve position shown in the figure, charge 0.8 MPa of nitrogen (when the pressure is stable), and leave them for 24 hours.
4. Check for pressure change after 24 hours.

4.6 (Optional) Leakage Test with Water

If the leakage test has been done with nitrogen, skip the test with water.

Manually open the chilled water valve. Inject water to 0.8 MPa, and preserve the pressure for 24 hours. Then connect a pressure gauge to a needle valve on the pipeline to measure the pressure. If the reading remains unchanged, the pipe is not leaking. You can perform the following operations.

4.7 Injecting Water to Expel Nitrogen

Clean the main pipe beforehand to avoid blockage of the heat exchanger due to foreign construction matter. Close the isolation valve on the water inlet and outlet pipes before the cleaning.
1. Open the general water supply valve. 2. Press the button on the side of the actuator and
manually rotate the valve handle to the maximum in the specified direction. Check that the chilled water valve is in the open state (100%). 3. Slowly open the exhaust valve to let out gas. 4. Adjust the gas releasing speed until no gas flows out of the valve. Then close the exhaust valve. 5. Manually close the chilled water valve.

7

5 Installing Cables
5.1 Connecting the Equipotential Ground Cable and Power Cable

1. When routing the cables, wrap the section of all signal cables inside the smart cooling product with the corrugated pipes and route them out of the corresponding cable holes so that the strong- and weak-current cables are separated.
2. Route the power cable along the rear door post, and use cable ties to secure the cable to the post every 150­200 mm.

1. Connect the equipotential cable.

2. Connect the power cable.

5.2

(Optional) Connecting the Water Sensor

5.3

Installing T/H Sensors Outside Cabinets

1. Connect the temperature and humidity (T/H) sensor cable.

T/H sensors in the aisle should be installed at the door frame inside the server cabinet and 1.5 m above the ground (33 U). After they are secured, set the sensor positions based on their location and the table.

8

2. Set the DIP switches on the T/H sensors.

Name

DIP Switch ID

Address

1

2

3

4

5

6

Cold aisle 1 temp/humid

11

ON

ON

OFF

ON

OFF

OFF

Cold aisle 2 temp/humid

12

OFF

OFF

ON

ON

OFF

OFF

Cold aisle 3 temp/humid

13

ON

OFF

ON

ON

OFF

OFF

Cold aisle 4 temp/humid

14

OFF

ON

ON

ON

OFF

OFF

Cold aisle 5 temp/humid

15

ON

ON

ON

ON

OFF

OFF

Hot aisle 1 temp/humid

21

ON

OFF

ON

OFF

ON

OFF

Hot aisle 2 temp/humid

22

OFF

ON

ON

OFF

ON

OFF

Hot aisle 3 temp/humid

23

ON

ON

ON

OFF

ON

OFF

Hot aisle 4 temp/humid

24

OFF

OFF

OFF

ON

ON

OFF

Hot aisle 5 temp/humid

25

ON

OFF

OFF

ON

ON

OFF

5.4 (Optional) Connecting the Teamwork Network Cable

Main control board ports

(1) T/H_1 (T/H RS485 communications port) (used for connecting to the external temperature and humidity sensor)
(2) T/H_2 (T/H RS485 communications port) (used for connecting to the external temperature and humidity sensor)
(3) CAN_IN/CAN_OUT/FE_IN/FE_OUT (used for teamwork networking and FE_IN/FE_OUT are reserved)
(4) COM_IN (RS485 communications port) (used for connecting to the monitoring system)
(5) COM_OUT (RS485 communications port) (used for connecting to the monitoring system)
(6) FE (used for connecting to the monitoring system)
(7) USB

The smart cooling product supports both FE teamwork networking and CAN teamwork networking (hand-inhand).

9

· All smart cooling products in a teamwork group must be of the same model. · Do not directly connect the first and the last smart cooling products to form a ring network. · A maximum of 32 smart cooling products can be networked in one group. The teamwork
cable between two adjacent smart cooling products must not exceed 10 m. · If CAN networking is required onsite, set Enable teamwork CAN resistor for the first and last
smart cooling products to Yes on the screen. Connecting an FE teamwork network cable Connect one end of the FE network cable to the FE port on the main control module, connect the other end to the POE port on the smart ETH gateway.
CAN teamwork networking cable 1. Prepare the 8 pin standard network cable, the cable pin sequence requirements are shown
below.
2. Connect the CAN_OUT port of each smart cooling product to the CAN_IN port of the following smart cooling product using a CAN network cable. After powering on the device, set the Enable teamwork CAN resistor to Yes for the first and last devices in a teamwork group.
10

5.5 (Optional) Connecting the Monitoring Network Cable
The smart cooling product supports both RS485 monitoring and FE monitoring. Connecting the FE monitoring cable (SNMP/Modbus-TCP protocol)
The FE monitoring and FE teamwork use the same network cable. Connect the FE monitoring cable in the same process of connecting the FE teamwork network cable.
RS485 Monitoring Network Cable (Modbus-RTU Protocol) 1. Make the COM network cable by referring to the following figure.
2. Group smart cooling products for monitoring based on performance requirements and connect the monitoring network cables.
· If there is no teamwork control, connect the COM_IN port on each smart cooling product to the customer's monitoring system.
· In CAN networking, connect the COM_IN port on the first smart cooling product in each monitoring group to the monitoring device.
11

6 Verifying the Installation

No. Check Item

Check Result

1

All water pipes are properly blockage, and sharp turns.

and

securely

installed,

and

free

from

leakage,



Passed



Failed

The liquid level detector is level. The water pan is free from foreign 2 matter such as cable remains and thermal insulation foam. Cables are
securely bound and not in the water pan.

 Passed  Failed

The distance between two chilled water pipes outside the cabinet is

3 sufficient (recommended distance: longer than 25 mm), the hose is

 Passed  Failed

tightly wrapped with insulation foam, and joints are secured using glue.

4

The pipeline system has passed the pressure preservation and air tightness tests.

 Passed  Failed

5

The needle valve plugs are secured (torque of 0.45±0.05 N·m), and screw caps are tightened.

 Passed  Failed

6 The cabinet is reliably grounded.

 Passed  Failed

7

The power cables and signal cables are correctly connected and properly separated. Strong-current and weak-current cables are separately bound.

 Passed  Failed

The chilled water valve and its actuator are securely installed. The chilled water connector joints have been wrapped with thermal insulation foam, 8 and no metal or hose is exposed. Cables are securely connected to the  Passed  Failed chilled water valve actuator. The actuator manual button is reset (ejected state).

7 System Power-On
7.1 Power-On
1. Turn on the smart cooling product switch in the power distribution cabinet and the AC1 and AC2 switches on the smart cooling product.
2. After the device is powered on for the first time, the LCD displays the Quick Settings screen. Log in as the admin user, and set parameters as instructed, such as language, date format, date, time, and time zone. If the device is not powered on for the first time, the home screen is displayed.

· Users are classified into admin and operator. The preset password is 000001 for both types of users.
· After powering on, the smart cooling product is in shutdown mode.

7.2 (Optional) Setting the T/H Control Type

Application Scenario
Cold aisle containment Hot aisle containment Non-aisle containment

Recommended T/H Control Type
Cold aisle control Cold aisle control Return air control

Remarks
If cold aisle T/H sensors are not configured, you can also choose the supply air control. If cold aisle T/H sensors are configured, you can also choose the cold aisle control.

Path: Settings > System Settings > Common Settings or Settings > System Settings > T/H Sensor.
7.3 (Optional) Enabling the T/H Sensor Outside the Cabinet
If a T/H sensor outside the cabinet is installed, enable it. Path: Settings > System Settings > Common Settings or Settings > System Settings > T/H Sensor

12

7.4 Temperature and Humidity Settings
Set Temperature and humidity control type, Control point temperature setpoint, and Control point humidity setpoint as required on site. Path: Settings > System Settings > Common Settings or Settings > System Settings > T/H Sensor.
7.5 (Optional) Setting the Indoor Fan Control Type
If a micro differential pressure sensor is installed and the pressure difference control is required, set Air-side difference pressure sensor type to 0­50 Pa, and set the Indoor fan control type to Pressure diff ctrl. It is recommended that the Indoor fan pressure difference setpoint retain the default value. If there are hot spots onsite, you can increase the value. Path: Settings > System Settings > Indoor fan
7.6 (Optional) Teamwork Settings
1. Teamwork group no.: One teamwork networking can contain four groups at most. They must have the same teamwork control number and can be assigned 1­4 respectively.
2. Smart cooling product address: In a teamwork control group, each smart cooling product address (1-32) must be unique, and the smart cooling product with minimum address is the master smart cooling product.
3. Networking mode: The networking mode set on the screen must be consistent with the actual networking mode. CAN network indicates teamwork control over a CAN bus, MAC_CAN network teamwork control over an FE port.
4. Enable teamwork CAN resistor: In CAN networking, set this parameter for the first and last smart cooling products to Yes.
5. Number of smart cooling products in this group: Indicates the number of precision smart cooling products in a group. The value is an integer ranging from 1 to 32.
6. Number of running smart cooling products in this group: Specifies the number of running NetCol5000-Cs in a group. The value ranges from 1 to the number of NetCol5000-Cs in the group.
7. Rotation function: Enable the active and standby smart cooling products to work alternately. This function is recommended when the heat load is even.
8. When Requirement control is set to Anti-competitive running, the master smart cooling product synchronizes operating data (parameters such as the T/H control type, temp set point, humid set point for the master smart cooling product) to the slave smart cooling product, and all the precision smart cooling products in the group refer to the mode delivered by the master smart cooling product. When Requirement control is set to Disable, all the smart cooling products operate based on their own requirements. When the requirement control is Indoor fan unified control or Central load distribution, all smart cooling product fans in the group rotate at the same speed.
13

The table uses 8 smart cooling products in CAN teamwork as an example.

No.

1

2

3

...

7

Teamwork group no. 1

1

1

...

1

Air conditioner address

1

2

3

...

7

Enable teamwork CAN resistor

Yes

No

No

...

No

Teamwork function Enable Enable Enable ...

Enable

Item Networking mode

CAN

CAN

CAN

CAN

CAN

Number of air

conditioners in this 8

/

/

...

/

group

Number of running air conditioners in this group

6 (2 standby)

/

/

...

/

Rotation function

Enable /

/

...

/

Requirement control Enable /

/

...

/

8 1 8
Yes Enable CAN
/
/ / /

The table uses 8 smart cooling products in MAC_CAN teamwork as an example.

No. Item

Teamwork group no. Air conditioner address Teamwork function
Networking mode
Number of air conditioners in this group

1 1
1
Enable MAC_CA N
8

2 1
2
Enable MAC_CA N
/

3 1
3
Enable MAC_CA N
/

... ...
...
... MAC_CA N
...

7 1
7
Enable MAC_CA N
/

8 1
8
Enable MAC_CA N
/

Number of running air conditioners in this group

6 (2 standby)

/

/

...

/

/

Rotation function

Enable /

/

...

/

/

Requirement control Enable /

/

...

/

/

14

8 Startup and Wizard Startup

1. First startup flowchart

Offline Boot

Offline Boot or Online Boot can be selected for the first startup.

Start

Tap Start on the home screen.

· Download the Service Expert app from Huawei app store and runs on Android. Apply for permission after downloading the app.
· Except that the indoor fan item is mandatory, you can clear other commissioning items that are not required.
· If this is not the first startup, choose Maint > Wizard Startup to enter wizard startup.
· If no humidifier or is configured, their commissioning items are not displayed.

After tapping Yes, the barcode and the verification code are shown on the screen.
Open the Service Expert app.
Tap Startup > Offline Activation on app.
Enter Bar code and Verification code, and tap Generate PWD.
Enter the generated startup password on the screen of smart cooling product.

Tap Enter. The screen turns to Wizard Startup.

Tap Yes on Wizard Startup screen to enter wizard startup.

Tap No on Wizard Startup screen to exit wizard startup.

Online Boot

Start

Insert the WiFi module to the USB port on the main control board

Choose Settings > Comm Settings > WIFI Settings on the home screen and set WiFi password.

Connect WiFi by your mobile phone

Open the Service Expert app, and Tap StartUp on the home screen of the app

Choose Link, and input IP, port, username, password, and devAddr. Tap Login.

Tap Login after the parameters are set.

Tap OK. Then the device starts.
15

2. Wizard startup flowchart Start

Identify notes and check items

No

Yes Precautions

Commissioning

No

interrupted

(Handle the fault

Indoor fan commissioning

Fail

by referring to the tips displayed

Success

on the home

Fail

screen. Perform

Chilled water valve commissioning

wizard startup

Success Humidifier commissioning

after the

Fail

handling.)

Success

End

· If the floor water overflow alarm is generated, the smart cooling product will shut down by default. If you do not need to stop the smart cooling product, contact Huawei technical support engineers to evaluate risks. After the risk is accepted, choose Settings > System Settings > System Control, and set the Water overflow alarm action to Inactivity or Only indoor fan running or Humidification stopped.
· If the in-cabinet water overflow alarm is generated, the humidifier will stop by default. If you do not need to stop the humidifier, contact Huawei technical support engineers to evaluate risks. After the risk is accepted, choose Settings > System Settings > System Control, and set the Water overflow alarm action to No action or Only the indoor fan running or Shutdown.

9 Checking the Commissioning

Check Item

Result

The controller exits diagnostic mode.

 Passed  Failed

The temperature and humidity are correctly set.

 Passed  Failed

Check that the chilled water valve is closed.

 Passed  Failed

10 Power-Off 1. Tap Shutdown on the LCD home screen. 2. Turn off all switches on the smart cooling product. 3. If the smart cooling product will not be used over a long time, drain the water in the heat exchanger or take antifreeze measures to avoid frost cracks.
Appendix: Precautions Against Adding Glycol
To prevent glycol solution from corroding pipes and the heat exchanging coil, corrosion inhibitor should be mixed into the glycol solution. For details about the mixing schemes, consult glycol experts.

For details about device commissioning and maintenance, see NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual (2019) .

Huawei Technologies Co., Ltd.