Instruction Manual for Tot Mate models including: TM2125R Toddler Play Center, TM2125R, Toddler Play Center, Play Center

0964-3329 TM2125 2127 2128 LegoPlayCenter

Installation Manual (PDF)

Tot Mate Preschool Play Center 33" Wide (Maple/Maple, Ready-to-Assemble) : Toys & Games


File Info : application/pdf, 1 Pages, 1,011.14KB

PDF preview unavailable. Download the PDF instead.

91PFJ9X1Q8L
Toddler Play Center

Preschool Play Center

Preschool Play Center

TM2125R

by Stevens Industries, Inc. 704 West Main St. Teutopolis, IL 62467 P: 800.350.3270 P: 217-857-7100 F: 217-857-7101 www.totmate.com

TM2127R TM2128R

TM2125R
HARDWARE BAG# 0563-3304

TM2127R
HARDWARE BAG# 0563-3304

TM2128R
HARDWARE BAG# 0563-3304

CAUTION ­ CHOKING HAZARD
Adult assembly required due to presence of small parts and sharp edges.
Illustrations and part numbers are for TM2125R
Basic assembly instructions are the same for models shown. 2-Person assembly recommended.

ATTENTION
Please unpack and assemble in an area away from children's activities. Remove all tools and excess materials from work area after assembly of unit is complete. Dispose of pallet and packaging materials
in an environmentally friendly manner. If any parts are missing or damaged, please call Stevens for immediate parts replacement (1-800-350-3270). When ordering parts, give the Model Number and
Color of the unit.

NOTE: Refer to exploded drawing for orientation of holes to parts.

IMPORTANT! Be sure to keep all parts supported during assembly to avoid damage. Do not over-tighten bolts or it will damage
the pre-drilled holes. Snug fit is adequate.

STEP 1: Lay one End (1) flat on floor, with side having the most holes facing up. NOTE: Raw edge is top edge.
STEP 2: Insert dowel on Rail Support (4) into lower hole at top of End (3). Press firmly into place.
STEP 3: Insert dowels on one end of Bottom (2) into remaining holes on End (3). Press firmly into place.
STEP 4: Position other End (3) on top of assembly, so dowels on Rail Support (4) and Bottom (2) align with holes on End (3). Press firmly in place.
STEP 5: Secure End (3) to Rail Support (4) and Bottom (2) with three Confirmat Bolts (10) using included Hex Wrench.
STEP 6: Carefully turn assembly over, so other End (3) is facing up. STEP 7: Repeat Step 5 to secure End (3) to Rail Support (4) and Bottom (2). STEP 8: Carefully stand unit upright and align holes in Top (1) with dowels on top edge of
Ends (3), making sure the pre-installed Lego Plate (5) is facing up. Press Top (1) firmly into place. STEP 9: Secure Top (1) to Ends (3) with four Confirmat Bolts (10). STEP 10: The 4-piece Gear Block Grid (8) fits onto the Lego Plate (5), or can be set aside for later use. Trays (6) are included for storage on lower shelf. STEP 11: Ensure that all joints and bolts are tight. This completes the assembly.

HARDWARE / TOOLS INCLUDED
(Phillips screwdriver required but not included.)

Confirmat Bolt (5) (Screw Conn HxDc Ni
7mmx50mm)

Hex Wrench

PARTS for TM2125R
ITEM QTY DESCRIPTION 1 1 Top 2 1 Bottom 3 2 End 4 1 Rail Support 5 2 Lego Plate, Large Gray LGP50x50 6 3 Tray, Clear 6in F/2 SA911 7 10 Screw Conn HxDc Ni, 7mm x 50mm 8 4 Gear Block, Totmate Red 7x7

raw edge

©2023 Stevens Industries, Inc. Due to continuing product development, Stevens reserves the right to change specifications without notice.

10/6/23 #0964-3329



References

Adobe PDF Library 17.0 Adobe InDesign 18.5 (Windows)