Ecoer ODU Motherboard Compatibility Setup Guide

ODU Motherboard Compatibility Setup Guide

WARNING: Disconnect all power to unit before installing or servicing. More than one disconnecting switch may be required to de-energize the equipment. Hazardous voltage can cause severe personal injury or death.

ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES.

Description

The table provides compatibility explanations for different motherboard components and the corresponding product series they are compatible with.

Parts Name Ecoer code Product Series (Decades) Product Series (Decades Extreme) Product Series (TDi Pro)
Motherboard component(2436) EAC230904156 ✔️
Motherboard component(4860) EAC230904157 ✔️
Motherboard component(2436) EAC230904158 ✔️
Motherboard component(4860) EAC33301000005 ✔️
Motherboard component(2436) EAC230904165 [setting 1] [setting 2] [setting 3]
Motherboard component(4860) EAC230904166 [setting 1] [setting 2] [setting 3]

Notes

  • " [setting 1] ": Set n18=1 for compatibility with the Decades series.
  • " [setting 2] ": Set n18=2 for compatibility with the Decades Extreme series.
  • " [setting 3] ": Set n18=3 for compatibility with the TDi Pro series (Default configuration).

Setup Instructions

When using a compatible motherboard (EAC230904165/EAC230904166) to match TDi Pro series products, no modifications are required. However, if you intend to use them to match Decades or Decades Extreme series products, please follow the steps below for setup:

Step 1: Dip Switch Setting

Set the dip switch of the pressure switch to the ON position (upper position). Leave the HPS (high pressure switch) terminal empty. Note that the Decades and Decades Extreme series do not have the HPS.

The yellow-colored HPS port does not require any wiring.

Diagram Description: A close-up view shows a dip switch labeled 'SW0'. The 'ON' position, which is the upper position, should be selected. The HPS port is visible and noted as not requiring wiring.

Step 2: Motherboard Replacement and Power-up

Follow the standard steps for replacing the motherboard components. Power on the outdoor unit and keep it in standby mode (do not send any startup commands). Ensure proper wiring of the motherboard before system power-up.

Step 3: n18 Setting Adjustment

Change the n18 setting from 3 to 1 (for Decades models) or 2 (for Decades Extreme models).

Diagram Description: A circuit board with a digital display and control buttons (BS1, BS2, BS3, BS4) is shown. The setup process is as follows:

  • Hold BS1 for 5 seconds to enter the settings menu.
  • Press BS2 to navigate and select the 'n18' setting.
  • Press BS3 to confirm entry into the 'n18' setting value.
  • Press BS2 to select the desired value: 1 for Decades series, or 2 for Decades Extreme series.
  • Press BS3 to confirm the selected value.
  • Press BS1 to exit the settings menu.
  • Press BS3 to return to the previous operation screen.

Step 4: Operational Check

After completing the above setup, please perform a normal operational check on the device to ensure it is running properly.

Models: ODU Motherboard Compatibility Setup, ODU, Motherboard Compatibility Setup, Compatibility Setup, Setup

File Info : application/pdf, 2 Pages, 398.99KB

PDF preview unavailable. Download the PDF instead.

ODU-Motherboard-Compatibility-Setup-Guide 202406

References

WPS 演示

Related Documents

Preview Ecoer ESi Decades Extreme R-410A Unitary Service Manual
This comprehensive service manual provides essential technical information for the Ecoer ESi Decades Extreme R-410A Unitary system. It covers system components, operation modes, troubleshooting procedures, error codes, parts lists, and sensor characteristics, designed for HVAC service professionals.
Preview Ecoer ESi Decades Extreme Inverter Ducted Split System Quick Start-up Guide
A comprehensive quick start-up guide for the Ecoer ESi Decades Extreme Inverter Ducted Split System. This guide covers system features, technical specifications, wiring diagrams, line set and charging procedures, control board settings, error code explanations, IoT connectivity, and warranty registration.
Preview Ecoer ESi Decades Extreme AHU Installation Manual
Comprehensive installation manual for Ecoer ESi Decades Extreme High Efficiency Air Handlers (2-5 Ton Capacity, R-410A TXV Inside). Covers safety, dimensions, electrical wiring, airflow, ductwork, and more.
Preview Ecoer Personal Use Program Distributor Instructions
Instructions and guidelines for distributors participating in the Ecoer Personal Use Program, offering contractors a 20% discount on Ecoer systems for personal use.
Preview Ecoer 96% AFUE Gas Furnace MGH96 Model - Engineering Submittal Sheet
This document provides detailed engineering specifications, features, dimensions, and installation guidelines for the Ecoer 96% AFUE Gas Furnace, MGH96 Model. It covers product overview, technical data, air delivery, venting, and safety information.
Preview Ecoer EBCT3036BBA Multi-position Cased Coil - Technical Specifications
Detailed technical specifications and dimensional drawings for the Ecoer EBCT3036BBA multi-position cased coil, including product features, materials, and connection details.
Preview Ecoer EBCT2430ABA Multi-position Cased Coil - Technical Specifications
Detailed technical specifications and submittal information for the Ecoer EBCT2430ABA multi-position cased coil, featuring an all-aluminum evaporator coil, R-454B refrigerant, and dimensions.
Preview Ecoer EBCT4248CBA Multi-position Cased Coil Technical Specifications
Detailed technical specifications and diagrams for the Ecoer EBCT4248CBA multi-position cased coil, including dimensions, refrigerant type, and application details.