EG4 Brightmount Fixed Angle Ground Mount System
PARTS DIAGRAM
DIMENSIONS AND LAYOUT
All measurements above are in millimeters.
INSTALLATION
Tools Needed
- Glove
- Power Tool
- Crescent Wrench
- Meter Rule
- Drill 12.5 mm
- Allen Wrench
- Install leg group
Using a M8’80 bolt, M8 washers, M8 nut install the U45 connector as shown to the right. - Install mounting bracket
Using M8’65 bolts, M8 washers and M8 nuts to connect the legs to the mounting bracket as shown to the left. - Install ‘L’ foot
M8’65 bolt, M8 washers, and M8 nut to install the ‘L’ foot. - Connect the mounting bracket to concrete anchor.
- Use the expansion screws when mounting.
- Follow these images for rail installation.
- Connect the frames together using junction brackets, and M8 allen bolts.
- Completed construction.
PV ATTACHMENT
- Install PV modules using the End & Mid clamps
- Install earth lug on the end of the rails.
www.eg4electronics.com
support@eg4electronics.com
Sulphur Springs. TX
October 2022
Rev A Specifications subject to change without notice
Documents / Resources
![]() | EG4 Brightmount Fixed Angle Ground Mount System [pdf] Installation Guide Brightmount Fixed Angle Ground Mount System, Brightmount, Brightmount Ground Mount System, Fixed Angle Ground Mount System, Ground Mount System, Fixed Angle |