1. Introduction
This instruction manual provides essential information for the safe and efficient operation, installation, and maintenance of the ZHRCLY CBXZ Machine Tool Cooling Oil and Water Pump, Model DOB-25-120W. Please read this manual thoroughly before operating the pump to ensure proper usage and to prevent damage or injury.
This pump is designed for circulating cooling oil and water in machine tool applications, ensuring optimal temperature regulation for machinery components.
2. Safety Information
WARNING: Failure to follow these safety instructions may result in serious injury or equipment damage.
- Always disconnect power before performing any installation, maintenance, or troubleshooting.
- Ensure the pump is properly grounded to prevent electrical shock.
- Do not operate the pump with damaged cords or plugs.
- Wear appropriate personal protective equipment (PPE) such as safety glasses and gloves when handling fluids or operating the pump.
- Ensure the pump is installed in a well-ventilated area, away from flammable materials.
- Do not exceed the specified operating voltage and current.
- Keep children and unauthorized personnel away from the operating machinery.
3. Product Overview
The ZHRCLY DOB-25-120W pump is a robust unit designed for continuous duty in demanding industrial environments. It features a durable construction suitable for circulating various cooling fluids.

Figure 1: ZHRCLY CBXZ Machine Tool Cooling Oil and Water Pump (Model DOB-25-120W). This image displays the general appearance of the pump, highlighting its compact design and robust housing, suitable for industrial applications.
Key Features:
- Efficient fluid circulation for cooling systems.
- Durable construction for industrial use.
- Designed for both oil and water-based coolants.
4. Setup and Installation
4.1 Unpacking
Carefully remove the pump from its packaging. Inspect for any signs of damage during transit. Report any damage to your supplier immediately.
4.2 Mounting
- Choose a stable, level surface near the machine tool's coolant reservoir.
- Secure the pump using appropriate fasteners through the mounting holes provided. Ensure the pump is firmly attached to prevent vibration during operation.
4.3 Fluid Connections
- Connect the pump's inlet to the coolant reservoir using appropriate hosing and clamps. Ensure a tight, leak-free connection.
- Connect the pump's outlet to the machine tool's cooling system inlet.
- Verify that all connections are secure and that the hoses are not kinked or obstructed.
4.4 Electrical Connection
- Ensure the power supply matches the voltage and frequency requirements specified on the pump's label.
- Connect the pump to a grounded electrical outlet. If direct wiring is required, consult a qualified electrician.
- Verify all electrical connections are secure and insulated.
5. Operating Instructions
5.1 Pre-Operation Check
- Confirm that the coolant reservoir is filled to the appropriate level with the correct type of cooling fluid (oil or water-based coolant).
- Check all fluid connections for leaks.
- Ensure the pump is securely mounted.
- Verify electrical connections are safe and correct.
5.2 Starting the Pump
- Turn on the power supply to the pump.
- Observe the pump for any unusual noises or vibrations.
- Check for proper fluid flow through the cooling system.
5.3 Stopping the Pump
- Turn off the power supply to the pump.
- If the system will be idle for an extended period, consider draining the fluid to prevent stagnation or freezing, depending on the fluid type and environment.
6. Maintenance
Regular maintenance ensures the longevity and optimal performance of your ZHRCLY cooling pump.
6.1 Routine Checks (Daily/Weekly)
- Fluid Level: Check the coolant level in the reservoir and refill as necessary.
- Leaks: Inspect all hoses and connections for any signs of leaks.
- Noise/Vibration: Listen for unusual noises or excessive vibration, which may indicate a problem.
- Filter: If applicable, check and clean the inlet filter to prevent clogging.
6.2 Periodic Maintenance (Monthly/Quarterly)
- System Flush: Periodically flush the entire cooling system to remove accumulated debris and contaminants.
- Fluid Replacement: Replace cooling fluid according to the fluid manufacturer's recommendations or if it appears degraded.
- Electrical Connections: Inspect electrical wiring and connections for wear or corrosion.
For any complex maintenance or repairs, it is recommended to consult a qualified technician or contact ZHRCLY customer support.
7. Troubleshooting
| Problem | Possible Cause | Solution |
|---|---|---|
| Pump does not start | No power supply Faulty wiring Motor overload protection tripped | Check power connection and circuit breaker Inspect wiring for damage; consult electrician Reset overload protector; investigate cause of overload |
| Low fluid flow | Low coolant level Clogged inlet filter/hoses Air in the system Worn impeller | Refill coolant to proper level Clean filter and clear hoses Bleed air from the system Contact service for impeller replacement |
| Excessive noise/vibration | Loose mounting Air in the system Foreign object in pump Worn bearings | Tighten mounting bolts Bleed air from the system Disconnect power and inspect pump for obstructions Contact service for bearing replacement |
| Fluid leakage | Loose connections Damaged hoses/seals | Tighten all hose clamps and fittings Replace damaged hoses or seals |
8. Specifications
| Feature | Detail |
|---|---|
| Model Number | DOB-25-120W |
| Brand | ZHRCLY |
| Item Weight | 20 pounds |
| Product Dimensions | 1 x 1 x 1 inches |
| Manufacturer | Original factory |
| ASIN | B0DKN7PB9X |
Note: Specifications are subject to change without prior notice for product improvement.
9. Warranty and Support
For warranty information, technical support, or service inquiries, please contact your point of purchase or the ZHRCLY customer service department. Please have your model number (DOB-25-120W) and purchase date available when contacting support.
Contact information can typically be found on the product packaging or the manufacturer's official website.