Introduction

This manual provides essential information for the safe and proper installation, operation, and maintenance of your Leviton LP220-BPD 20 Space, 20 Circuit Indoor Load Center with a 200 Amp Main Circuit Breaker. Please read all instructions carefully before beginning any work. This load center is designed for indoor use and is NEMA 1 rated. The enclosure and interior are included; the door is sold separately.

Safety Information

WARNING: Risk of electric shock or electrocution. Installation and servicing of this electrical equipment must be performed by a qualified electrician in accordance with all national and local electrical codes. Always turn off power at the main service disconnect before working on the load center. Use appropriate personal protective equipment (PPE).

Product Overview

The Leviton LP220-BPD Load Center offers a modern, efficient solution for residential electrical distribution. Key features include:

Leviton LP220-BPD Load Center with dimensions

Image 1: Leviton LP220-BPD Load Center showing overall dimensions (14.25"L x 4"W x 30"H) and key specifications like 200 Amps, 20 Spaces/Circuits, Main Breaker Included, and NEMA 1 Indoor rating.

Internal view of Leviton LP220-BPD Load Center showing wiring features

Image 2: Internal view of the load center highlighting features such as notches for cable ties, white powder-coated finish, included main breaker, custom lugs for hot and neutral wires, tin-plated copper bussing, and invertibility for bottom feed applications.

Setup and Installation

Installation should only be performed by a qualified electrician. Follow all applicable electrical codes.

1. Mounting the Load Center

  1. Choose a suitable indoor location for flush or surface mounting, ensuring adequate clearance around the panel.
  2. Securely mount the load center enclosure to the wall studs or appropriate structural support.

2. Wiring at Rough-in

  1. With no circuit breakers present, neatly land all branch phase and neutral wires directly onto the panel's custom lugs.
  2. Utilize the stamped notches for cable ties to organize and secure wiring within the enclosure.
  3. Ensure all connections are tight and conform to torque specifications.

3. Installing Circuit Breakers

Leviton's plug-on design allows for quick and easy installation of circuit breakers.

  1. Align the Leviton circuit breaker with the desired space on the bussing.
  2. Firmly snap the breaker into place. No additional wiring is required for the breaker itself.
  3. Repeat for all necessary circuit breakers.
Hand installing a Leviton circuit breaker into the load center

Image 3: A hand demonstrating the plug-on installation of a Leviton circuit breaker into the load center, emphasizing the ease and speed of installation.

4. Main Breaker Customization

The modular panel design and 225 Amp rated bussing allow for in-field main breaker customization, providing flexibility for future upgrades.

Video 1: Official Leviton Load Center Video. This video demonstrates the key features and installation benefits of the Leviton Load Center, including the easy wiring at rough-in, plug-on circuit breakers, and modular design for future upgrades.

Operating the Load Center

Once installed, the load center operates like a standard electrical panel. Circuit breakers protect individual circuits from overcurrents and short circuits.

Resetting a Tripped Circuit Breaker

  1. Locate the tripped breaker, which will typically be in an intermediate position between 'ON' and 'OFF'.
  2. Firmly push the breaker handle to the full 'OFF' position.
  3. Then, push the handle to the full 'ON' position to restore power.
  4. If the breaker immediately trips again, there may be a persistent fault. Do not attempt to reset it repeatedly. Consult a qualified electrician.

Maintenance

The Leviton Load Center requires minimal maintenance. Regular inspections by a qualified electrician are recommended.

Two types of Leviton load center doors, standard and window, sold separately

Image 4: Illustration of two types of doors for the Leviton Load Center: a standard solid door (LDC20) and a windowed door (LDC20-W), both sold separately.

Troubleshooting

For persistent electrical issues, always consult a qualified electrician.

ProblemPossible CauseSolution
Circuit breaker trips frequentlyOverloaded circuit, short circuit, ground fault, or faulty appliance.Reduce load on the circuit. Unplug appliances. If problem persists, consult an electrician.
No power to a circuitTripped circuit breaker, loose connection, or power outage.Check and reset the circuit breaker. Verify main power supply. If issue continues, contact an electrician.
Load center feels warmNormal operation under load, or potentially loose connections/overload.A slight warmth is normal. If excessively hot or accompanied by burning smell, immediately turn off main power and call an electrician.

Specifications

AttributeDetail
BrandLeviton
Model NumberLP220-BPD
Product Dimensions14.25"L x 4"W x 30"H
AC Adapter Current200 Amps
MaterialCopper
Number Of Circuits20
Phase TypeSingle Phase
Item Weight22.7 pounds
UPC078477996188

Smart Home Integration (Optional)

The Leviton Load Center is compatible with optional smart upgrades, allowing for enhanced energy management and control. This includes the ability to install Leviton Whole Home Energy Monitors and 2nd Gen Smart Circuit Breakers, which can be enrolled in the My Leviton App.

Diagram showing steps for Leviton smart home integration

Image 5: A diagram illustrating the three steps for smart home integration: 1) Install the Leviton Whole Home Energy Monitor, 2) Snap in 2nd Gen Smart Circuit Breakers, and 3) Enroll Breakers in the My Leviton App.

Warranty and Support

For specific warranty details and customer support, please refer to the official Leviton website or contact Leviton customer service directly. Keep your purchase receipt for warranty claims.

Leviton offers various protection plans for their products. For more information on available protection plans, please visit the Leviton website or consult your retailer.

Related Documents - LP220-BPD

Preview Leviton Load Center Enclosure Installation Instructions
Detailed installation instructions for Leviton Load Center Enclosures, models LP2xx, LP3xx, LP4xx, and LP6xx. Covers safety, knockout removal, mounting, wiring, branch circuit breaker installation, and cover fitting.
Preview Leviton Load Center Phase Maps Installation Guide
This guide provides phase map illustrations to simplify the installation of the Leviton Whole Home Energy Monitor (LWHEM). It details where to terminate power wires and mount the Smart Mains Metering Accessory CTs for monitoring whole-home energy consumption.
Preview My Leviton App Guide: Control Your Smart Home Devices
Explore the My Leviton App Guide to easily enroll, integrate, and customize your Decora Smart Wi-Fi devices and Leviton Load Center with Smart Breakers for seamless smart home control.
Preview Leviton GFCI Receptacle Installation and Testing Guide
A comprehensive guide on how to install and test a Leviton SmartLock Pro GFCI Receptacle, including wiring instructions, safety precautions, and troubleshooting tips.
Preview My Leviton App Guide: Smart Home Control for Decora Smart Wi-Fi and Load Centers
A comprehensive guide to using the My Leviton app for managing Leviton Decora Smart Wi-Fi devices and Leviton Load Centers with Smart Breakers. Covers setup, schedules, activities, device settings, dashboard customization, energy monitoring, and customer support.
Preview My Leviton App Guide: Decora Smart Wi-Fi and Load Center
A comprehensive guide to using the My Leviton app for managing Leviton Decora Smart Wi-Fi devices and Leviton Load Centers with Smart Breakers. Learn about setup, device management, scheduling, energy monitoring, and customer support.