Categories: AFFINITY

AFFINITY Stone Veneer Panel Installation Guide

AFFINITY Stone Veneer Panel Installation Guide

Introduction

Affinity Stone panels make installation simple, without mortar, and without hassle. The ease of installation and impeccable results make Affinity a must for your next building project. Our easy-fit stone panels interlock for a smooth, secure fit.

Affinity Stone Components

  • Starter Strip – 4” x 96”
  • Wainscot Cap 23.5 x 2.75”
  • Flat Affinity Stone Panel
  • Wainscot Cap (Fastening strip on bottom)
  • Corner Affinity Stone Panel

Tools Required

You will need a level, chalk line, screw gun, masonry saw, dead blow hammer, straight edge, hammer, and safety equipment.

Jobsite preparation

Affinity Stone Panels have been engineered with a built-in rain screen system. House wrap is required behind our product for exterior applications.

Be sure to check with local building codes before beginning.

Wall Types

Be sure to use a minimum of 2 screws per panel, 1 into framing member. 

Standard framed wall

  • Use 1/2” plywood or 7/16” OSB
  • Use corrosion resistant self tapping wood screws

Concrete Wall

Use corrosion resistant self tapping concrete screws into pre-drilled holes

Installing the Starter Strip

  1. Mark a horizontal and level line 4 ¼ inches above the desired height of the bottom of the stone. (Be sure to check local building codes for clearances required) This line marks the top of the starter strip.
  2. Screw the starter strip into place. Place screws every 8 inches to minimize movement of the starter strip. Leave ½” in between each starter strip to allow for expansion/ contraction. Apply a building cladding tape over the top of the starter strip.

Installing Affinity Stone Panels

  1. Affinity Stone panels require two screws per panel, one of which is required to be into framing.
  2. Due to the orientation of the panel, it is easiest to install from right to left whenever possible.
  3. Place the first panel into the starter strip and mark the wall at the top of the concrete panel. (Do not mark at the top of the plastic frame)
  4. Remove that panel and use a laser or snap a chalk line on that mark across the wall.
  5. Install the first course, ensuring that the top of the concrete panel is aligned with the line marked on the wall in step 4.
  6. DO NOT attempt to align the plastic or rely on the starter strip for final panel placement.
  7. Be sure each panel is level and aligned to the top of the panel adjacent to it. A long straight edge may be helpful to ensure placement.
  8. Take your time with the first course – the rest of the wall will be affected by this course.
  9. Begin the second course by cutting a panel in half to offset the vertical alignment of the panels. This technique will provide a more natural appearance on the wall.
  10. As each course is installed, ensure the flange of each panel has been installed in the groove of the panel below and the vertical edges are in contact with the adjacent panel.

The Last Course

  1. Cut the last course to height minus ¼” to allow working room for installation.
  2. Install the last two courses at the same time so that you can slide the top course in with ease.
  3. Once the top panel is in place, pre-drill and countersink a hole through the panel. Screw a fastener into the panel but do not over tighten as you can crack the panel.
  4. Cover the hole with similar colored caulking or sealant.

Outside Corners

To ensure maximum potential of the look of natural stone, cut the first panel of every other course in half.

http://affinitystone.com/

PREMIUM QUALITY SIMPLE INSTALLATION IMPECCABLE RESULTS

Manufactured by Stone Creek Products, LLC
366 E SR 133, Arthur, IL, 61911
(217) 543-3875

Documents / Resources

AFFINITY Stone Veneer Panel [pdf] Installation Guide
Stone Veneer Panel, Veneer Panel, Stone Panel, Panel, Stone Veneer

Recent Posts

BOSCH PLL 360 Cross Line Laser Instruction Manual

PLL 360 Cross Line Laser OBJ_DOKU-17240-002.fm Page 1 Wednesday, December 9, 2009 12:49 PM Robert…

21 mins ago

HKS 32016-BT004 Exhaust System Hi-Power Muffler User Manual

32016-BT004 Exhaust System Hi-Power Muffler HKS Exhaust System User & Installation Manual <32016-BT004> <E65400-A40070-00> 20210906…

21 mins ago

QUOIZEL RNL9807EK 17 Inch Earth Black Outdoor Table Lamp Installation Guide

QUOIZEL RNL9807EK 17 Inch Earth Black Outdoor Table Lamp Installation Guide SAFETY INFORMATION READ ALL…

39 mins ago

KIMEX 031-1220K2 Roller Stand Instruction Manual

031-1220K2 Roller Stand SUPPORT MURAL 2 ECRANS 55" 031-3200K1 MANUEL D'INSTALLATION G> Lisez l'intégralité du…

47 mins ago

CMP DEL OZONE 25 Powerful Ozone Generator Instruction Manual

DEL OZONE 25 Powerful Ozone Generator POWERFUL OZONE GENERATOR c-m-p.com/DEL YOU CAN SEE AND FEEL…

55 mins ago

TurtleBeach Recon 50X Headset User Manual

TurtleBeach Recon 50X Headset User Manual

56 mins ago